{"product_id":"general-electric-4136j57-g01-mark-iii-dual-set-point-board","title":"General Electric 4136J57-G01 Mark III Dual Set-Point Board","description":"\u003cp\u003eThe \u003cstrong\u003eGeneral Electric 4136J57-G01\u003c\/strong\u003e serves as the primary \u003cstrong\u003e4136J57\u003c\/strong\u003e Dual Set-Point Board utilized to execute closed-loop two-point setpoint comparison and alarm control across Mark III gas turbine control platforms.\u003c\/p\u003e\n\u003ch3\u003eHardware Specifications\u003c\/h3\u003e\n\u003cfigure class=\"table\"\u003e\n\u003ctable\u003e\n\u003cthead\u003e\n\u003ctr\u003e\n\u003cth\u003e\u003cstrong\u003eParameter\u003c\/strong\u003e\u003c\/th\u003e\n\u003cth\u003e\u003cstrong\u003eSpecification\u003c\/strong\u003e\u003c\/th\u003e\n\u003c\/tr\u003e\n\u003c\/thead\u003e\n\u003ctbody\u003e\n\u003ctr\u003e\n\u003ctd\u003eModel\u003c\/td\u003e\n\u003ctd\u003e4136J57-G01 (4136J57)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eBrand\u003c\/td\u003e\n\u003ctd\u003eGeneral Electric\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eOrigin\u003c\/td\u003e\n\u003ctd\u003eUSA\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eWeight\u003c\/td\u003e\n\u003ctd\u003e0.91 kg (2.00 lbs)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eDimensions\u003c\/td\u003e\n\u003ctd\u003e48.26 cm x 31.75 cm x 8.89 cm (19.00 in x 12.50 in x 3.50 in)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eOperating Temp\u003c\/td\u003e\n\u003ctd\u003e0 to 60 deg C\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003ePower Consumption \/ Voltage Supply\u003c\/td\u003e\n\u003ctd\u003e250 VAC (15 Hz to 70 Hz frequency range)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eController Architecture\u003c\/td\u003e\n\u003ctd\u003eTwo-Point Closed-Loop (Bang-Bang \/ On-Off)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eContact Relay Option\u003c\/td\u003e\n\u003ctd\u003eDual Contact Relays Rated 8 A at 250 VAC\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003ctr\u003e\n\u003ctd\u003eSolid-State Relay Option\u003c\/td\u003e\n\u003ctd\u003eDual Form A AC\/DC Relays (120 mA at 125 VAC \/ 250 mA at 150 VDC)\u003c\/td\u003e\n\u003c\/tr\u003e\n\u003c\/tbody\u003e\n\u003c\/table\u003e\n\u003c\/figure\u003e\n\u003ch3\u003eBackplane Bus Communication Velocity and Deterministic Networks\u003c\/h3\u003e\n\u003cul\u003e\n\u003cli\u003eThe General Electric 4136J57-G01 integrates into internal bus architectures to sustain predictable backplane bus communication velocity and execute deterministic loop comparison algorithms.\u003c\/li\u003e\n\u003cli\u003eDual channel setpoint evaluation logic continuously compares measured process parameters against operator limits to issue instantaneous contact state transitions.\u003c\/li\u003e\n\u003cli\u003eOption configurations featuring solid-state relays support high-duty cycles and low-level signal switching while preserving low signal distortion across I\/O scaling setups.\u003c\/li\u003e\n\u003cli\u003eOnboard circuit design provides firmware flash compatibility and galvanic isolation between field measurement loops and internal logic processing units.\u003c\/li\u003e\n\u003c\/ul\u003e\n\u003ch3\u003eFrequently Asked Questions\u003c\/h3\u003e\n\u003cp\u003eQ: Which relay configuration is recommended for high-frequency switching operations on the 4136J57-G01?\u003c\/p\u003e\n\u003cp\u003eA: The solid-state relay configuration (120 mA at 125 VAC or 250 mA at 150 VDC Form A) is specified for heavy-duty cycles and low-level electrical loads.\u003c\/p\u003e\n\u003cp\u003eQ: Can the setpoint selection relay options be changed without removing control bus power?\u003c\/p\u003e\n\u003cp\u003eA: No, supply voltage of 250 VAC and system bus power must be fully isolated before installing or servicing plug-in setpoint controller option boards.\u003c\/p\u003e\n\u003ch3\u003eField Installation Guidelines\u003c\/h3\u003e\n\u003cp\u003eIsolate all 250 VAC power feeds and auxiliary control supplies to the turbine cabinet before beginning physical installation. Ensure the technician wears an ESD wrist strap connected to cabinet earth ground while handling the 4136J57-G01 board. Carefully seat the module onto its enclosure mounting standoffs and secure the structural retainers against mechanical vibration. Wire all signal comparison inputs and relay contact output channels using shielded twisted-pair conductors, terminating the cable shield at a single cabinet ground point to prevent ground loops. Confirm correct relay plug-in orientation before restoring operational power.\u003c\/p\u003e","brand":"General Electric","offers":[{"title":"Default Title","offer_id":45320368849011,"sku":"4136J57-G01","price":88.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0644\/4348\/2227\/files\/4136J59-G01_1200x1200_0872e7cf-3754-45da-b4d3-f29443ed5f3f.jpg?v=1786005690","url":"https:\/\/www.dcssupplier.com\/products\/general-electric-4136j57-g01-mark-iii-dual-set-point-board","provider":"DcsSupplier Limited","version":"1.0","type":"link"}